CreateSpool This allows a user to add a Spool Drawing to the system Quality Administrator Cord has received an Isometric that requires breakdown The Quality Administrator receives the spool drawings from the ACORN team 1. When the Quality Associate receives the spool drawing, they enter section lengths, weld locations and weld procedures into the system 2. The system receives the spool information stores the spool drawing object and returns a mark number (SpoolID) 3. System returns status message System returns spool information including mark number